Can I lay screed and apply Hessler natural lime plaster at the same time

Due to the very high air humidity and the subsequent drying of the screed by heating, natural lime plaster must be applied either before or after. If natural lime plaster is applied before the screed, it must be allowed to dry completely (approx. 1 day per mm of application thickness).